Completed | 2015 | Outdoor | Project
ABD Engineering & Design worked with this downtown Chicago event space to help them control sound from their existing venue, The Pavilion, the expansion, la Pergola, and the outdoor wedding arbor. Our engineers performed an acoustical study to establish a baseline of...
Completed | 2011 | Higher Education | Project
The acoustical challenge of the Kinross Building on the campus of UCLA was to provide speech privacy in an open office environment. Open offices spaces tend to encourage worker collaboration, but can be problematic when speech privacy is a concern. At ABD Engineering...
Completed | August, 2010 | Higher Education | Project
ABD Engineering and Design provided recommendations for room acoustics, sound isolation, and HVAC systems noise control for the Student Wellness and Recreation Facility, including climbing room, 5-court gymnasium with upper level running track for recreational...
Completed | 2009 | Higher Education | Project
ABD Engineering and Design provided comprehensive acoustical consulting, HVAC noise control engineering, and audio-video design services for the entire Fieldhouse (including two large rear projection displays which are integrated into the interior architecture of the...
Completed | August, 2009 | K-12 | Project
ABD Engineering and Design was brought in by URS Corporation as the audio system consultants for this multifaceted athletic addition. Our audio visual designers worked with the architect and the school to design audio systems for the: Football Field, Soccer Field,...