Featured Projects
Search and sort projects with your choice of search options including types of venues, regions, and keyword search text below.

Rock The Locks Music Festival Music Festival Noise Study
ABD Engineering & Design worked with J-U-B Engineers on the City of Umatilla Rock The Locks Music Festival. ABD created a model of the site based on the site plan,…

Chehalem Cultural Center Phase 3 Performing Arts Wing
Scott Edwards Architecture, the Chehalem Park and Recreation District (CPRD), and Chehalem Cultural Center (a nonprofit 501(c)(3) organization) brought ABD Engineering & Design in for this adaptive reuse project. The…

Fremont Ross High School Performing Arts Center K-12 Performing Arts
ABD Engineering & Design worked with Thendesign Architecture on complete acoustical consulting for this new high school performing arts center. ABD’s acoustical engineering services for the Fremont Ross High School…

Video Studio Expansion Engineering Firm in Eastern Washington
ABD Engineering & Design was hired by a national engineering firm to assist with the expansion and improvement of their existing video studio in Eastern Washington State. The studio, in…

Interlochen Music Center Interlochen Center for the Arts
ABD Engineering & Design worked with Cornerstone Architects to develop complete acoustical recommendations for the state-of-the-art Music Center. The Music Center includes a variety of acoustically critical listening spaces: 3…

Muskegon Community College Arts & Humanities Theater, Music, and Art
ABD Engineering & Design worked with Progressive AE on updates to the Muskegon Community College Overbrook Theater, and to renovate and re-purpose the applied technologies building for use as music…

Jim and Martie Bultman Student Center Hope College
ABD Engineering & Design worked with Stantec (Philadelphia) on the Hope College Jim and Martie Bultman Student Center, the college’s first dedicated student-center space since 1980. The facility includes a…

Grand Rapids Community College Albert P. Smith Music Center and Linn Maxwell Keller Performance Hall
The original building was constructed in 1922 and served as a physical education facility for Strong Junior High School, and then Grand Rapids Junior College. It was first renovated for…

Hale Centre Theatre Mountain America Performing Arts Centre
ABD Engineering and Design performed an environmental study to help anticipate the noise from the highway adjacent to the theater, and followed up with complete room acoustics, noise isolation, and…

Grand Valley State University Haas Performing Arts Center and Linn Maxwell Keller Black Box Theater
The addition of a black box theater to the existing performing arts center, along with three new ensemble rooms, and renovations to the existing music and dance department spaces, were…