Featured Projects
Search and sort projects with your choice of search options including types of venues, regions, and keyword search text below.
![ABD Engineering & Design North Eugene High School](https://www.abdengineering.com/wp-content/uploads/2024/04/North_Eugene_HS_PAC2-200x200.jpg)
North Eugene High School New High School
ABD Engineering & Design worked with Rowell Brokaw Architects, Opsis Architects and Eugene School District 4J to provide complete acoustical engineering and audiovisual design. The new high school replaces the…
![Ben Davis High School Theater](https://www.abdengineering.com/wp-content/uploads/2023/07/Ben_Davis_HS_Auditorium_stage1-200x200.jpg)
Ben Davis High School Auditorium and Theater
ABD Engineering & Design worked with Schmidt Associates to provide acoustical engineering and audiovisual design services for renovating the existing 1200 seat auditorium and 480 seat theater. ABD’s acoustical engineers…
![Fremont High School Performing Arts Center](https://www.abdengineering.com/wp-content/uploads/2023/02/Freemont_High_School_Auditorium-200x200.jpg)
Fremont Ross High School Performing Arts Center K-12 Performing Arts
ABD Engineering & Design worked with Thendesign Architecture on complete acoustical consulting for this new high school performing arts center. ABD’s acoustical engineering services for the Fremont Ross High School…
![South Salem High School Performing Arts](https://www.abdengineering.com/wp-content/uploads/2022/05/SSHS-auditorium-side-200x200.jpg)
Performing Arts Auditorium and Music Rooms South Salem High School
ABD Engineering & Design worked with Anderson Shirley Architects and Salem-Keizer Public Schools to provide acoustical consulting and audiovisual design for the performing arts auditorium and music rooms renovation. The…
![Tillamook High School Auditorium](https://www.abdengineering.com/wp-content/uploads/2021/01/Tillamook_Auditorium-before-after-200x200.jpg)
Auditorium Renovation Tillamook High School
ABD Engineering & Design worked with ZCS Engineering & Architecture on their seismic upgrade and renovation of the Tillamook High School Auditorium. The articulated ceiling needed to be removed and…
![Muskegon Community College Arts & Humanities](https://www.abdengineering.com/wp-content/uploads/2019/05/MCC-medium-ensemble-200x200.jpg)
Muskegon Community College Arts & Humanities Theater, Music, and Art
ABD Engineering & Design worked with Progressive AE on updates to the Muskegon Community College Overbrook Theater, and to renovate and re-purpose the applied technologies building for use as music…
![Winston Churchill High School Auditorium](https://www.abdengineering.com/wp-content/uploads/2019/04/Livonia-churchill-auditorium-200x200.jpg)
Winston Churchill High School Performing Arts Center Auditorium
ABD Engineering & Design worked with French Associates, Inc. on a complete renovation of the existing auditorium. Our work on the project included room acoustics to properly deliver sound from…
![La Porte High School Performing Arts Center](https://www.abdengineering.com/wp-content/uploads/2018/11/Audiotorium-wide-200x200.jpg)
La Porte High School Performing Arts Center
ABD Engineering & Design worked with Schmidt Architects on complete acoustical consulting and audiovisual design for this auditorium and support spaces renovation project. Rotating an existing auditorium 90 degrees to…
![University of Montana Early Childhood Education Center](https://www.abdengineering.com/wp-content/uploads/2018/10/UMT_CEHS_Auditorium_1-200x200.jpg)
UMT Early Childhood Education Center University of Montana
ABD Engineering & Design worked with OZ Architects on this University of Montana Early Childhood Education Center project for the Phyllis J. Washington College of Education and Human Sciences. ABD…
![Grand Rapids Community College Albert P. Smith Music Center](https://www.abdengineering.com/wp-content/uploads/2018/01/GRCC-Music-School-200x200.png)
Grand Rapids Community College Albert P. Smith Music Center and Linn Maxwell Keller Performance Hall
The original building was constructed in 1922 and served as a physical education facility for Strong Junior High School, and then Grand Rapids Junior College. It was first renovated for…