Featured Projects
Search and sort projects with your choice of search options including types of venues, regions, and keyword search text below.
NW Natural Headquarters Corporate Headquarters
ABD Engineering & Design worked with GBD Architects on the new NW Natural headquarters. Staff were accustomed to a combination of small open office areas, traditional cubicles, and closed offices.…
Grand + Belmont Apartments Mixed-Use Multi-Family Apartments
ABD Engineering & Design worked with Akron Moisan Architects on the Grand + Belmont Apartments. This is a 131 apartment and 6,000 square feet of ground-floor retail space multi-family mixed-use…
Auditorium Renovation Tillamook High School
ABD Engineering & Design worked with ZCS Engineering & Architecture on their seismic upgrade and renovation of the Tillamook High School Auditorium. The articulated ceiling needed to be removed and…
Center for Health & Healing Building 2 Oregon Health & Science University
ABD Engineering & Design worked with ZGF Architects to provide complete acoustical consulting services for building 2 in the OHSU Center for Health and Healing complex. Building 2 is composed…
University of Oregon Allen Hall Experience Hub
ABD Engineering & Design worked closely with PIVOT Architecture and University of Oregon School of Journalism and Communications staff on the Allen Hall Experience Hub renovation. Complex Connected Spaces The…
Sam Barlow High School Auditorium Classrooms, Performing Arts Center, Offices
ABD Engineering & Design worked with Opsis Architecture and the Gresham-Barlow School District to provide acoustical and audiovisual design of Sam Barlow High School. The school focuses on STEM and…
Kaiser Permanente Sunnyside Medical Center Hybrid OR and CVL
Selecting and verifying locations for a hybrid operating room (hybrid OR) and a central venous line (CVL) procedure room requires specialized vibration analysis and mechanical noise and vibration control. ABD…
TriMet Warning Bells Light Rail Pedestrian Crossings
Beginning with measurements taken in 2015, ABD Engineering & Design worked with TriMet to conduct sound measurements of warning bells at MAX Light Rail pedestrian crossings. When it was discovered…
Woodburn High School Band and Chorus Rooms
ABD Engineering & Design worked with BBL Architects to develop room acoustics and noise isolation recommendations for the Woodburn High School performing arts classrooms. Band and chorus rooms are often…
Marriott AC Hotel Portland Downtown
ABD Engineering & Design worked with SERA Design and Architecture to provide recommendations for room acoustics, noise isolation, and mechanical noise control throughout the hotel guest rooms, conference rooms, lobby,…